动漫精品亚洲一区二区,亚洲精品乱码久久久久久动漫,国产自美女在线精品尤物,99久久精品国产免费

news
Analysis and design of cable production line control system
Publisher:admin  Click:1023

The cable production process we adopted is: to ensure that the plastic temperature in the barrel of the extruder is constant, the equipment is cooled by water and air at the same time. Start the production line when the extrusion temperature, luster and speed of the die are appropriate. Under the linkage control state, the running speed of the pay off machine, the extrusion machine, the tractor and the take-up machine can be automatically adjusted according to the production process requirements and production experience to achieve the purpose of appropriate tension and stable production. After passing through the head of the extruder, the bare copper wall and iron wall wires are molded and sealed with uniform plastic. After measuring the diameter, they are cooled to 40~60 ℃ through the water tank, dried by the fan to remove the water drops on the wires, and then printed.

The system control objectives are: wire front tension, wire rear tension, extruder speed, wire diameter, point movement speed, cooling water temperature, cooling water tank level, extruder cooling water pressure, etc.


Next:Cable reform boosts the industry to inject new vitality

Scan QR code

在線咨詢
Tel

0510-83296608

水富县| 双城市| 平谷区| 南乐县| 铅山县| 甘谷县| 香港| 甘泉县| 黔南| 宽甸| 龙井市| 茌平县| 兴化市| 田林县| 赤水市| 普定县| 东乌珠穆沁旗| 敦化市| 阳谷县| 甘南县| 察隅县| 樟树市| 阜康市| 扶沟县| 清水河县| 化州市| 海伦市| 湛江市| 博罗县| 鹤庆县| 丰宁| 松江区| 涟水县| 句容市| 隆回县| 土默特右旗| 如皋市| 海原县| 韶关市| 公安县| 江达县|